History

History Timeline

2020(109) years

Invested NT$300 million yuan to build a new factory in Nanke, and introduced automated manufacturing and precision assembly and adjustment production lines

2020-12-15

2019(108) years

1. Successfully entered the satellite supply chain

2. Undertake the construction of "plug-in magnets" in research institutions, and develop "elliptically polarized frequency-concentrated magnets" for accelerators

2019-01-25

2018(107) years

1. Listed on the OTC at 29.63 yuan per share

2. Participate in the development of "Rotary Driven Closed Refrigerator" in research institutes, and develop precision components for ultra-low temperature refrigerators

2018-11-19

2017(106) years

Servo valve precision parts and components have been certified and imported into production. Cooperate with research institutions to carry out micro-turbine engine manufacturing improvement and trial assembly operation.

2017-01-14

2016(105) years

The research institute technology transfer the manufacturing technology of "servo valve precision parts and sub-assemblies".

2016-01-05

2015(104) years

Successfully developed the precision components of the micro-turbine engine body.

2015-01-05

2014(103) years

Participated in the "Decentralized Gas Turbine Thermoelectric Symbiosis System" project of the research institute, and developed the "micro-turbine engine body" precision components.

2014-01-05

2009(98) years

Begin to build special process energy of aerospace grade.

2009-01-05

2007(96) years

Become a qualified supplier of British Aerospace Valve Company.

Became a qualified supplier of wafer lithography system for Holland Semiconductor Equipment Company.

Passed the AS-9100 aerospace quality system certification.

Passed ISO/TS16949 automotive quality management system certification.

2007-01-05

2004(93) years

Stocks are listed on the stock exchange and are publicly offered.

2004-01-05

2001(90) years

Passed the quality inspection of the first order of the power system department of American Aerospace Engine Company, and officially became a qualified supplier. Signed a contract with Canadian Aerospace Landing Gear Company to introduce aviation landing gear technology.

2001-04-26

2000(89) years

Passed the electric discharge machining process (EDM) certification of the engine division of American Aerospace Engine Company.

2000-07-18

1997(86) years

Become the qualified supplier of the world's largest semiconductor equipment manufacturer. ISO-9002:1994 certified.

1997-01-07

1996(85) years

The aerospace, semiconductor process equipment, energy and medical fields are selected as the entry point to enter the high-tech industry.

1996-11-02

1995(84) years

Enter high-tech industries such as IC process and packaging mold equipment.

1995-06-05

1994(83) years

A subsidiary company - Shanghai Gongzhun Precision Mould Co., Ltd. was established. Developed non-woven jacket molds, dust jacket molds and drive disk molds for 3.5-inch disks.

1994-02-11

1991(80) years

SPM650 easy-open can mold is professionally produced and successfully developed by itself.

1991-03-08

1978(67) years

It was established by the person in charge, Mr. Su Youxin. Mainly produces precision stamping, plastic injection molding dies and machining of mechanical parts.

1978-01-05

Get In Touch

No.168,Bade 2nd Rd.,Renwu Dist., Kaohsiung City 81453,Taiwan(R.O.C.)

service@mail.gongin.com.tw

+886-7-359-7177

+886-7-347-5077

© Gongin. All Rights Reserved. Designed by HTML Codex